Skip to main content

When to Reorder: Timing Your Next Batch

2026-11-08 mengshi 115 views

The first batch sold — but when do you order the second? Too early and your cash sits in inventory; too late and you stock out while a competitor takes your customer. Reorder timing is a balancing act: watch stock, watch turnover, watch sailing schedules — do not guess.

1. Four Signals That It Is Time to Reorder

Signal How to read it
Stock below six weeks of sales Red line: order now — sea freight still takes four to eight weeks
Turnover days keep falling Good sign: cars are selling faster; reorder at the same volume or more
One model drawing enquiries for two straight weeks Partial signal: top up that model alone, do not wait to fill a whole batch
Peak-season vessel space tightening External signal: lock space one or two months early — peak slots go fast

2. Three Ways to Size the Batch

  • By turnover: monthly sales times your target stock months (usually two to three), minus current stock and goods in transit — that is your order quantity.
  • By cash: available funds divided by landed cost per car gives the ceiling; keep twenty percent aside for marketing and spare parts.
  • By container: a full container holds six to ten cars depending on model. Round your batch to full containers — shared containers cost more per unit and arrive unpredictably.

3. Three Mistakes on the Second Batch

  • Getting carried away: a fast first batch may just mean you priced too low. Review per-unit profit before doubling the order.
  • Copying the first mix: whatever trim sold slowly in batch one should shrink in batch two — move that money to the movers.
  • Ignoring payment terms: batch one was paid in full as a trial; for a bigger batch two, negotiate partial credit or a letter of credit instead of tying up all your cash.

Shunwei Auto tip: Keep a one-page reorder sheet: weekly stock, weekly sales, quantity in transit and its expected arrival. With those four numbers in front of you, the reorder moment announces itself.

Note: Agree on a price-lock window with your supplier. Over the one or two months between order and arrival, both exchange rates and freight can move. Put the price-lock clause in the contract and batch two stays predictable.

mengshi